We offer OEM services.
Overview
Fast Specifics
- Area of Origin:Zhejiang, China
- Brand Title:
-
OEM
- Design Number:
-
Steering Wheel assembly established, Steering Wheel assembly established
- Type:
-
Go Karts Add-ons
- Certification:
-
CE
- Motor:
-
four Stroke
- Travel Method:
-
Chain Travel
- Wheel Measurement:
-
10×4.fifty-five/11×7.10-five
- Oil Tank Ability:
-
10L
- Optimum Speed:
-
60km/h
- Displacement:
-
50-200cc
- Brake Sort:
-
Hydraulic Brake
- Motor Ability:
-
fifty-200cc
- Shade:
-
Silver and Gold
- In shape:
-
Go kart
- CPNO:
-
FXJ.00001
Source Capacity
- Provide Capability:
- 1000000 Established/Sets for every Thirty day period
Packaging & Delivery
- Packaging Details
- 1) carton with pallets.
2) customized shade box with pallets.”>110cc Racing Cart Steering Wheel Tie Rod Shaft Mild Weight Assy
1) carton with pallets.
2) customized colour box with pallets.
- Port
- NINGBO/SHANGHAI PORT
On-line Customization
110cc Racing Cart Steering Wheel Tie Rod Shaft Gentle Excess weight Assy
Merchandise Description
It is 110 cc Go Kart steering wheel assembly established contains tie rod, and adjustable shaft as photo
The conclude to stop length range following the tie rod linked with the steering rack is from 33 inches to 35 inches.
The end to finish duration range 9.seventy five inches to 12.5 inches
Requirements:
Match for 110cc Go Kart
Bundle Consist of:
Tie rod, rack, adjustable shaft
Our Organization
Wenling Yubiao Machinery Manufacturing facility was established in 1998. We are a branch of Vivid Holding Team Limited and located in Binhai Industrial Location, HangZhou, Zhejiang Province. We have specialist engineers and administration team in the producing of the scooter and motorbike components for U.S.A, Russian, Europe, Brazil, and other nations. We have enough capability to satisfy diverse requirements from yours in this field. Who could deliver a good deal of intercontinental experience and professional and an unparalleled degree of services for you.
Our Solutions
Packaging & Delivery
FAQ
Q1. How to spend?
A: TT, PAYPAL, WEST UNION, DP, DA, Credit rating card up to you.
Q2. What is your expression of shipping and delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q3. How about your shipping time?
A: Generally, it will take 24-48 several hours right after getting your progress payment. Some is a single 7 days. The particular shipping time depends on the products and the quantity of your get.
This fall. How to make tailored products?
A: Sure, we can create by your samples or complex drawings. We can create the molds and fixtures.
Q5. How to get a sample?
A: We can offer the sample if we have ready elements in stock.
Q6. Do you examination all your goods prior to shipping and delivery?
A: Indeed, we have 100% take a look at just before shipping and delivery.
Q7: How do you make our company long-expression and excellent partnership?
A: one. We hold excellent quality and competitive price tag to make sure our clients reward
2. We respect every buyer as our friend and we sincerely do business and make friends with them, no matter the place they arrive from.