Owing to our vast solution selection and wealthy experiences in this market, we are confident to give our clients versatile and diversified companies.
Materials |
one. metallic:Aluminum/Steel/Alloy steel/Stainless steel/Brass,copper,bronze and so on. two. plastic: Stomach muscles,POM,PE,PP,PVC,Laptop,PMMA,Teflon,nylon and so forth. three. others: carbon fiber, glass,fiberglass, wooden, difficult rubber and many others. |
Coloration |
Silver, Gray, Black ,Gold or as client’s necessity |
Area Roughness |
Ra0.eight ( without sprucing or grinding) |
Symbol Technique |
laser engraving, CNC engraving, screen-printing etc. |
Surface area Finish |
Anodize sprucing zinc/nickel/chrome/gold plating, sand blasting, ect. |
Tolerance |
+/- .01–.05mm / can also be personalized |
Certification |
ISO SEPG |
Processing equipments |
CNC machining center,NC lathe, Grinding machine, Automated lathe equipment, Typical lathe equipment,Milling equipment,Drilling equipment,EDM,Wire-reducing equipment,CNC bending equipment and so on |
Testing device |
Coordinate measuring machine,Impression measuring instrument,Caliper and so on |
Application |
Health-related Instruments/Electronic/ Industrial// Automation / motorcycle/3D printer |
Services |
OEM,ODM or as client’s prerequisite |
Packaging & Delivery
Packaging Details
1. interior packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag and so on.
two. outer packaging: carton box, wood case, plate and so on.
3. as per customers’ need
Port
xiamen, or as client’s need
Direct Time :
Quantity(Items) | one – 20 | 21 – 100 | one zero one – 1000 | >1000 |
Est. Time(days) | five | ten | 25 | To be negotiated |
Trade Terms | FOB, CIF, EXW |
MOQ | 1Pcs |
Port | xiamen, or as client’s prerequisite |
Shipping | By air (DHL,UPS,Fedex,EMS and so forth.),By Sea,Specific… |
Payment Method | T/T(financial institution transfer),L/C,paypal,weOur business is situated in XiHu HangZhou Zhejiang Province. Tstern union, moneygram,escrow, money and so on |
Payment Terms | fifty% prior to manufacturing, fifty% just before supply |
Packing | internal box,numerous bins/master carton or as customer’s prerequisite |
Supply time | 5-7days for Alanple time,five-twenty five times for production |