we offer you a single-cease resolution for the purchase of mechanical electricity transmission and pto shaft, agricultural gearboxes goods in China.
Overview
Fast Particulars
- Brand name Identify:
-
OEM
- Design Quantity:
-
ATV wheel
- Spot of Origin:Zhejiang, China
- Tire specification:
-
19×7-eight
- Rims specification:
-
8×120
- Tire content:
-
Rubber
- Rims material:
-
Aluminum
- Colour:
-
Black
- Tube variety:
-
Tubeless
- Tire wheel diameter:
-
eight”
- Tread Width:
-
seven”
- Set up hole:
-
110mm
- Suits:
-
ATV
Source Ability
- Offer Capability:
- 100000 Set/Sets per Thirty day period
Packaging & Shipping
- Packaging Information
- one) carton with pallets.
two) personalized coloration box with pallets.
3) one established G.W. is six.2kg.
four) packing measurement:50cm x 50cm x 20cm.”>2016 scorching sale 19×7-eight ATV tires with wheel hub
1) carton with pallets.
two) custom-made coloration box with pallets.
three) one particular set G.W. is six.2kg.
4) packing size:50cm x 50cm x 20cm.
- Port
- NINGBO/SHANGHAI PORT
Online Customization
Merchandise Description
2016 scorching sale 19×7-8 ATV tires with wheel hub
It is universal for entrance and rear.
With outstanding use resistance, excellent elasticity, shock and strong.
Lower noise, excellent use resistance and high mileage.
Applicable to all sorts of roads, to maintain great driving stability and prolonged existence.
Top high quality and the very best favorable price.
Thorough Pictures
Other merchandise
5-a hundred and eighty-58mm Rim
11×7.1-5 Tyre
10×4.five-five Tyre and 5×130-58 Rim
Our Organization
Wenling EPG Equipment Manufacturing facility have expert engineers and management crew in the creating of the UTV/ATV elements, Mini bicycle elements and Gear for U.S.A,Russian, Europe, Brazil, and other countries from 2015.To be your secure and long phrase provider with our aggressive and better services,remember to contact with us.
Packing & Shipping
Our Support
FAQ
Q1. How to pay?
A: TT, PAYPAL, WEST UNION, DP, DA, Credit score card up to you.
Q2. What is your time period of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q3. How about your supply time?
A: Normally, it will get 24-48 hrs right after receiving your progress payment. Some is one 7 days. The distinct supply time is dependent on the products and the amount of your get.
This fall. How to generate custom-made products?
A: Sure, we can generate by your samples or technical drawings. We can develop the molds and fixtures.
Q5. How to get a sample?
A: We can supply the sample if we have prepared parts in stock.
Q6. Do you check all your items just before supply?
A: Indeed, we have a hundred% test just before delivery.
Q7: How do you make our organization long-term and good connection?
A: 1. We keep great quality and aggressive value to make sure our buyers benefit
2. We respect each and every client as our pal and we sincerely do business and make close friends with them, no matter exactly where they come from.